Page 22 - Vol.39-No.5
P. 22

HARVESTING AND STORAGE

                                            WHITE Projects and installed using Graph  in the feed’s material flow supported by
                                            Engineering equipment.  This controls  the Fike dust protection system.
                                            ensured optimal quality, on-time deliv-  Further protection of the slow speed
                                            ery and maintained accuracy for on-site   belt & bucket elevator with an internal
                                            alignment,  The steelwork arrangement   ATEX zone 20 rating is the inclusion of
                                            includes a short transfer tower near the   plastic buckets, head & boot belt align-
                                            Grain Terminal centre house and a very tall   ment, bearing, rotation and speed sensors.
                                            tower near to Silo 3 which is connected by   Two Delta Neu dust filters & the associated
                                            a double deck gantry conveying structure   dust extraction system has been installed
                                            with trestles to ground across approxi-  & successfully operating within the main
                                            mately 100m.  The double deck gantries   tower structure.  Filter 1 is dedicated to the
          The Silo 3 high and low level intercon-  are contained within an extremely tight   elevator operation with Filter 2 functioning
        necting conveyors have been adapted to   footprint running alongside Silo 4 and the   in conjunction with the grain feed onto the
        allow connection into the transfer reclaim   adjacent bulk flat storage facility with ad-  enclosed mill gallery belt conveyor where
        system and then for extension and mod-  ditional low- and high-level transitions at   a new aspirated infeed coffin box has been
        ification when the Silo 4 concrete grain   either end into the centre house & Silo 3   incorporated.
        terminal comes back on stream later in   respectively.                   Key to the project is the overall system
        2023.  The transfer reclaim system will be   Throughout the project, design stairways   automation and control of which working
        heavily utilised whilst the new concrete Silo  and safe-operator maintenance platforms   under T H WHITE Projects in conjunction
        4, which is currently making good progress,  have been incorporated plus the inclusion   with D B Brooks as the MCC & site wiring
        is constructed.                     of lifting beams, electrical sockets and   contractor, TBA have ensured an accurate
          Connecting the feed to and from the   lighting.  This is very evident in the main   software design, its implementation & in-
        Grain Terminal are a series of high-capacity   operating tower which houses the common   tegration with the existing Grain Terminal
        chain conveyors rated at 500 tph on the   belt and bucket elevator through its middle   operating system.
        transfer and 650t ph on the reclaim plus a   as it travels upwards from the 5m deep   After a successful period of dry & wet
        single common Guttridge elevator catering   pit to the top of the tower over a 45m   commissioning the 20,000 tonne steel silo
        for all selected routes.            distance and just over 200 steps if you are
                                            ascending the numerous flights of stairs.  In   grain storage facility, connecting transfer
          To implement the transfer reclaim ar-  the base of the tower the lower-level area   reclaim conveying & elevating system and
        rangement a significant amount of civil   is clad to assist in the weatherproofing of   16,000 tonne bulk flat store became op-
        engineering design and ongoing inspec-  the large elevator pit which has safe-stair   erational in August with the final commis-
        tion via CSP was required to support the   personnel access inside.  Further cladding   sioning & handover to the Port of Tilbury
        necessary groundworks throughout the   and enclosure is present towards the top   London Ltd completed this February 2023.
        site.  The groundworks content included   section of the tower structure where the   Based in the Southeast of England and lo-
        all the necessary piled concrete bases for   connection is made with the mill gallery belt   cated on the banks of the River Thames,
        the towers, trestles, plinths, switch rooms,   conveyor and feed system.  Also contained   the Grain Terminal which handles approx-
        transformers & main tower elevator pit plus   within the tower is a significant amount of   imately 2 million tonnes of cereals, pulses
        the associated drainage, sumps, pumping   interconnecting 600mm square wear re-  & beans per annum was initially built in the
        station, road bridge and fire main dry riser.  sistant lined chute runs and diverter valves   1960s & plays a significant role through-
          All the fabricated hot dip galvanised  connecting the various material routes.     out the global market in ensuring the food
        steelwork on the contract has been struc-  Plate magnets are deployed in the eleva-  chain is reliably supported & supplied with
        turally designed and manufactured by T H  tor chutes to collect any ferrous objects   on time quality materials.

                                                                                                   Circle 25 on enquiry card
         SYMAGA HAVE ACHIEVED GROWTH DEMANDS

                               BY UPGRADING THE SILOS



                                            our factory and our production process   Ana, Marta and Alfonso explain how
                                            and of course taking care of our human  Symaga has become what it is nowadays,
                                            team. In order to show the progress of our  and how it strives to adapt to its interna-
                                            company we have posted a new corporate  tional customers through investments on
                                            video that presents all the key facts which  projects such as MES and SGA for an indus-
                                            have contributed to our evolution of the last  trial production 4.0, always supported by an
                                            years, reinforcing Symaga as your reliable  employer network of 150 highly engaged
                                            partner for your storage project.   professionals under a permanent ongoing
                                              We have a proven record of 60M m3 of   training which ensures the reliability of each
                                            storage capacity built in more than 14.000   project, from the layout drawing to the end
          In today´s fast changing environment   big projects in over 150 countries. Our ex-  of the assembly. As a second generation
        achieving growth demands continous   perience of more than 35 years combined   of the Garrido family they tell us about
        improvement to adapt to the demands   with our group of 150 professionals makes   the important values his father has passed
        surrounding us. In Symaga have achieved   us one of the key leaders in manufacturing   down to them, which they hope to pre-
        this by upgrading our silos, Symaga have   industrial Silos.            serve for the future generations ensuring
        achieved this by upgrading our silos both                               the continuity and growth of the company.

      20         Vol. 39 No. 5                        Circle 26 on enquiry card
   17   18   19   20   21   22   23   24   25   26   27